main contents:
pre production preparation operating procedures production process control
production records
site clearing
I. pre production preparation (5 points)
? 1. Before operation, the personnel of aluminum plastic packaging (tablet) post shall carefully read the production instructions and relevant process parameters and clarify the work contents? 2. The production operators change clothes according to the changing procedures and enter the aluminum-plastic packaging (tablet) room? 3. Clear the site of aluminum plastic packaging (tablet) post
(1) clear the site of aluminum plastic packaging (tablet) room according to the management procedure for production site clearing. Paste the production certificate into the corresponding position in the batch production record of drugs. (2) Indicate the production status of operation room and equipment; Read the temperature, humidity and air pressure difference in the operation room and record them in the batch production record
? 4. Receiving materials and packaging materials: (1) according to the provisions of batch production record, collect materials at the intermediate station, review the materials according to the material handover form, confirm that they are correct, collect the material handover form and certificate of conformity, paste them at the corresponding positions in the batch production record, and transfer the materials to the packaging room. (2) According to the provisions of batch production order, collect the packaging materials from the temporary storage room of packaging materials? 5. Check the equipment, confirm that it is “clean and qualified”, “in good condition”, meets the process requirements and is ready for standby
II. Operation process
? Aluminum plastic packaging:? Install the mold according to the requirements of production equipment, change the batch number, preheat, print the batch number, check, and notify the team leader and QA to check? Open the materials in the aluminum-plastic packaging room, and add the materials into the hopper with a clean special ladle according to the sequence number of the materials? Operate according to the standard operating procedure of DPP-250 automatic blister packaging machine? The team leader and QA shall inspect the aluminum-plastic packaging at any time. The operators shall carefully check the batch number, empty eye and packaging material printing. After the clean bag is filled, it shall be weighed, rechecked, labeled and handed over to the intermediate station. After packaging, fill in the inspection request and calculate the yield
III. production process control (4 points)
? 1. Before packaging, under the supervision of QA, the post operators shall check the name and batch number of the packaged materials according to the batch production records, which shall be rechecked by the technologist? 2. In the process of production and operation, the post operators shall operate in strict accordance with the production process conditions and post operation procedures specified in the process procedures? 3. In case of deviation and abnormality, it shall be handled according to the deviation management procedure? 4. The production operations of different product varieties and specifications shall not be carried out at the same time in the same operation room
IV. production records
? Operators shall carry out production operations in strict accordance with the operation instructions in the batch production record and fill in the batch production record in time? After the operation, submit the batch production record of the post to the technologist and workshop director for review? Then it shall be incorporated into the batch production record of this batch of drugs according to the process
v. site clearing (6:00)
after the operation of aluminum-plastic packaging (tablets), the operators shall clean the work site according to the management procedures for production site clearing. 1. Clean up the materials
(1) after measuring and recording the tablets that meet the quality requirements, fill in the material handover form and transfer it to the intermediate station for storage. Hang the material handover form on the material status sign, fill in the inspection request form and notify the QA supervisor to take samples. (2) After measuring and recording the tailings after packaging, it shall be transferred to the intermediate station for production tailings management. (3) Collect waste medicine materials (contaminated packaged tablets), measure and record them, and discard them into temporary containers. (4) Clean up and collect the labels of all waste materials on site and discard them in the temporary storage container of waste. (5) Submit the material cleaning records of the production site to the workshop director in time for material balance. (6) If the material balance meets the requirements, the QA supervisor shall review and sign. If the material balance is abnormal, it shall be handled according to the deviation management procedure
2. Cleaning
(1) after the completion of production, clean according to the cleaning operation procedures of DPP-250 automatic blister packaging machine. (2) Clean the tools and instruments according to the operating procedures for cleaning tools and instruments in clean area and put them into the designated area
3. The operation room shall be cleaned in accordance with the operating procedures for cleaning workshop in clean area. 4. Clean up the production record folder: sort out the production instructions and record documents related to the production of this batch of drugs in order, and exit the operation room with the personnel. 5. Site clearance inspection:
after site clearance, notify the site clearance inspector, issue the site clearance certificate after passing the inspection, paste it in the corresponding position in the batch production record of drugs, and close the door of the operation room
6. At the end of production, the operator shall exit the clean area and leave the workshop according to the operating procedures for personnel entering and leaving the clean area.